In short: Lift-and-shift migration — moving applications to the cloud unchanged — fails in Nepal because it ignores the country’s bandwidth bottlenecks, frequent connectivity outages, strict data residency rules under the Directives 2081, and the cost paradox of running legacy architecture at cloud prices. Gartner estimates that 83% of cloud migrations fail to achieve desired results, and 70% of enterprises report no promised cost savings from lift-and-shift approaches. For Nepali enterprises, a phased hybrid cloud strategy — modernising workloads selectively while keeping sensitive systems in-country — delivers better ROI, lower risk, and full regulatory compliance. Silver Lining designs and operates the in-country private cloud foundation that makes this phased model work.
The promise of lift-and-shift is seductive: move everything to the cloud, change nothing, save money. In Nepal, that promise breaks down faster than almost anywhere else.
This guide explains why the approach fails here specifically, and what a phased hybrid strategy delivers instead.
Nepal’s internet infrastructure imposes hard constraints that lift-and-shift architectures simply assume away. Research shows 72.7% of surveyed Nepali organisations face bandwidth bottlenecks, and full cloud migration is considered impractical for many due to internet reliability. Domestic firms endure an average of six outages a month, each lasting around six hours. Nepal is landlocked, with 97% of routing passing through India and no direct access to submarine fibre.
An application lifted into a public cloud region in Mumbai or Singapore now depends on international links that fail regularly. What was a local database call becomes a cross-border round trip — and every outage becomes your outage.
Under the Data Center and Cloud Service (Operation and Management) Directives, 2081, citizen and government data must be stored, processed, backed up, and replicated exclusively within Nepal. Any data centre storing government data must hold a minimum Tier 3 rating.
Lift-and-shift into an offshore public cloud region is not a suboptimal choice in Nepal — for regulated and public-sector workloads, it is a compliance breach.
Lift-and-shift produces what one analysis calls “the worst of both worlds: cloud pricing with on-premises architecture”. Applications sized for fixed hardware run on cloud instances provisioned for peak load, producing 60–80% resource waste during normal operations. Storage patterns built around cheap local disks collide with expensive cloud storage tiers. Internal service calls that were “free” on-premises become billable data transfer.
The result is monthly cloud bills that exceed previous data centre costs while delivering worse performance and reliability. That is why 70% of enterprises report failed cost savings — and many spend significantly more.
Cloud security is architecturally different from on-premises security. Lift-and-shift migrations routinely apply old security patterns inappropriately, creating gaps rather than closing them. In Nepal, where security misconfigurations are already a leading cause of breaches, this is an expensive shortcut.
Lift-and-shift gets you into the cloud but does not change how your business operates. Gartner’s finding is blunt: 83% of cloud migrations fail to meet expectations when they stop at lift-and-shift. Auto-scaling, managed services, and cloud-native resilience remain unused while you pay premium prices for basic compute.
A phased hybrid approach does not reject the cloud — it sequences it. Workloads are assessed, then moved according to what each one actually needs, with sensitive systems staying in-country on private infrastructure.
Silver Lining is a Nepal-based cloud computing and data hosting provider with ISO 27001:2022, ISO 20000-1:2018, and ISO 9001:2015 certified infrastructure, serving private and public sector clients across Nepal:
Q: Why does lift-and-shift fail specifically in Nepal?
A: Three reasons dominate: bandwidth bottlenecks and frequent outages make offshore cloud dependencies unreliable; data residency rules under the Directives 2081 make offshore hosting of citizen and government data unlawful; and lift-and-shift produces cloud pricing with on-premises architecture, driving costs up rather than down.
Q: What is a phased hybrid cloud strategy?
A: An approach that assesses each workload individually and migrates it in sequenced waves — keeping sensitive or latency-critical systems on in-country private cloud while moving suitable workloads to public cloud capacity, with modernisation applied where it delivers measurable ROI.
Q: How much better is hybrid cloud ROI than lift-and-shift?
A: Organisations that modernise applications during migration see 40% higher ROI than those that simply relocate legacy workloads. Meanwhile, 70% of enterprises report that lift-and-shift failed to deliver promised cost savings.
Q: Does a hybrid strategy satisfy Nepal’s data residency requirements?
A: Yes — provided the private cloud component is hosted in Nepal on DoIT-enlisted infrastructure. Hybrid lets you keep citizen and government data in-country while using public cloud only for non-sensitive workloads.
Q: Does Silver Lining support phased hybrid cloud migrations?
A: Yes. Silver Lining provides the in-country private cloud foundation, migration assessment, disaster recovery, and managed security services needed for a phased hybrid strategy, backed by ISO-certified infrastructure in Nepal.
The most expensive mistake in cloud migration is starting with the move instead of the analysis. Silver Lining can assess your application estate, model the TCO of hybrid versus lift-and-shift, and design a phased roadmap measured against real ROI.
→ Talk to Silver Lining | Request a hybrid cloud workload assessment
AI-driven security for a safer digital future.
Secure your digital world with intelligent protection designed for modern businesses and everyday use. Stay protected while you browse, work, and connect.
Kamalpokhari, Kathmandu, Nepal
Durbarmarg, Kathmandu, Nepal
Bhairahawa, Nepal
Nakkhu, Lalitpur, Nepal